Armed Forces Reserve Center at Moffett Federal Airfield

Location
Ohio
Market
Federal Government
Services
Architecture / Interior Design / Engineering

The Challenge

In 1934, Building 23 at Wright-Patterson Air Force Base was constructed as an aircraft hangar and test facility. More than 70 years later, the U.S. Air Force wanted to renovate the building to provide a modern lab facility for state-of-the-art energy research. It requested a design that retains the historic feel and aesthetic of the original building, while also creating a modern interior that meets security and force protection requirements.

The Solution

A three-story facility was created within the existing brick shell, adding new spaces for material processing, data acquisition, operations, and fabrication. The design also had special acoustical needs due to the use of vibration-sensitive equipment such as lasers and optical equipment. The superstructure is composed of a structural steel frame and designed to resist collapse in accordance with Antiterrorism/Force Protection (AT/FP) requirements.

Barge Design Solutions provided HVAC, plumbing, steam, lighting and power distribution, communications and security, utilities, storm drainage, lighting protection, and fire protection. Site work included sidewalks, curbs and gutters, access drive control systems, and site upgrades to meet AT/FP requirements. Architectural and interior design were also included as part of the project.

The Impact

The renovation of Building 23 was a testament to Barge's engineering expertise and commitment to excellence. Barge successfully transformed a historic asset into a modern, sustainable, and secure facility, meeting the evolving needs of the U.S. Air Force. The team's ability to balance preservation with innovation while also prioritizing sustainability and security positioned Barge as a valuable partner in this critical project. The project exceeded the original goal of designing to a LEED Silver level, making it the first LEED Gold building on the base.

The Challenge

Armed Forces Reserve Center at Moffett Federal Airfield requested six buildings that included a fitness center, offices, classrooms, an assembly hall, training space, and space for outdoor physical activity. The Federal government wanted to streamline construction and reduce costs while working with an aggressive schedule.

The Solution

As the lead design firm on this project, the Barge Design Solutions team used a "whole building" approach that asked members of the planning, design, and construction teams to look at materials, systems, and assemblies from different perspectives. Design charrettes allowed the team to work through adjustments in real-time, employing value engineering during the process. Plans for the center were consolidated from six buildings to three, resulting in increased construction efficiency and decreased cost.

The Result

The Barge team's innovative approach not only met the functional requirements of the Armed Forces Reserve Center at Moffett Federal Airfield but also delivered substantial cost savings and improved project efficiency. This case demonstrates the value of a holistic design approach and the importance of value engineering in complex construction projects.

Architecture / Interior Design
Engineering
Federal
No items found.
Armed Forces Reserve Center at Moffett Federal Airfield
Consult with an Expert
Thank you!
Your message has been submitted
Oops! Something went wrong while submitting the form.

We're collaborative by design. Let's team up.

Begin your project development journey today by contacting us.