The Challenge

In 1934, Building 23 at Wright-Patterson Air Force Base was constructed as an aircraft hangar and test facility. More than 70 years later, the U.S. Air Force wanted to renovate the building to provide a modern lab facility for state-of-the-art energy research. It requested a design that retains the historic feel and aesthetic of the original building, while also creating a modern interior that meets security and force protection requirements.

The Solution

A three-story facility was created within the existing brick shell, adding new spaces for material processing, data acquisition, operations, and fabrication. The design also had special acoustical needs due to the use of vibration-sensitive equipment such as lasers and optical equipment. The superstructure is composed of a structural steel frame and designed to resist collapse in accordance with Antiterrorism/Force Protection (AT/FP) requirements.

Barge Design Solutions provided HVAC, plumbing, steam, lighting and power distribution, communications and security, utilities, storm drainage, lighting protection, and fire protection. Site work included sidewalks, curbs and gutters, access drive control systems, and site upgrades to meet AT/FP requirements. Architectural and interior design were also included as part of the project.

The Impact

The renovation of Building 23 was a testament to Barge's engineering expertise and commitment to excellence. Barge successfully transformed a historic asset into a modern, sustainable, and secure facility, meeting the evolving needs of the U.S. Air Force. The team's ability to balance preservation with innovation while also prioritizing sustainability and security positioned Barge as a valuable partner in this critical project. The project exceeded the original goal of designing to a LEED Silver level, making it the first LEED Gold building on the base.

The Challenge

Knoxville's central business district is a hub for numerous businesses and hosts various events year-round. The Knoxville Utilities Board (KUB) needed to modernize by replacing outdated cast iron water lines beneath the district. This underground space was also congested with utilities and trolley tracks, some dating back to the 1890s, which made minimizing disruptions a key priority. Barge Design Solutions developed a comprehensive plan to replace the wastewater system and improve the natural gas and electric duct bank infrastructure.

The Solution

Barge pulled mapping records, including the original hand-drawn utility notes, to research the previous infrastructure. Designers and surveyors collaborated to lay out and review data for an accurate survey that could be used to design the project. This work enabled a productive installation that minimized utility outages.

The Result

Barge's successful completion of the Knoxville utility infrastructure replacement project demonstrates their ability to address complex infrastructure challenges while minimizing disruptions to the community. Their thorough planning, accurate surveys, and expertise in utility design and installation were instrumental in achieving a positive outcome.

No items found.
Knoxville Downtown Infrastructure Replacement
Consult with an Expert
Thank you!
Your message has been submitted
Oops! Something went wrong while submitting the form.

We're collaborative by design. Let's team up.

Begin your project development journey today by contacting us.