The Challenge

In 1934, Building 23 at Wright-Patterson Air Force Base was constructed as an aircraft hangar and test facility. More than 70 years later, the U.S. Air Force wanted to renovate the building to provide a modern lab facility for state-of-the-art energy research. It requested a design that retains the historic feel and aesthetic of the original building, while also creating a modern interior that meets security and force protection requirements.

The Solution

A three-story facility was created within the existing brick shell, adding new spaces for material processing, data acquisition, operations, and fabrication. The design also had special acoustical needs due to the use of vibration-sensitive equipment such as lasers and optical equipment. The superstructure is composed of a structural steel frame and designed to resist collapse in accordance with Antiterrorism/Force Protection (AT/FP) requirements.

Barge Design Solutions provided HVAC, plumbing, steam, lighting and power distribution, communications and security, utilities, storm drainage, lighting protection, and fire protection. Site work included sidewalks, curbs and gutters, access drive control systems, and site upgrades to meet AT/FP requirements. Architectural and interior design were also included as part of the project.

The Impact

The renovation of Building 23 was a testament to Barge's engineering expertise and commitment to excellence. Barge successfully transformed a historic asset into a modern, sustainable, and secure facility, meeting the evolving needs of the U.S. Air Force. The team's ability to balance preservation with innovation while also prioritizing sustainability and security positioned Barge as a valuable partner in this critical project. The project exceeded the original goal of designing to a LEED Silver level, making it the first LEED Gold building on the base.

The Challenge

The Decatur Utilities Mallard Fox Lift Station serves the Mallard Fox Creek Industrial Park, a 1,000-acre industrial site in Decatur, Alabama. To accommodate near-term expansion and future build-outs of the park, Decatur Utilities needed to expand the existing pump station’s capacity beyond 3.7 million gallons per day.

The Solution

Barge Design Solutions provided three expansion alternatives to the client: (1) expand the existing pump station, (2) upgrade the existing facility and construct a second station to operate in parallel, and (3) abandon the existing facility and construct a new station. The company then worked with Decatur Utilities to select the best long-term solution, and it was decided to build a new pump station to replace the current one. This new pump station more than quadruples capacity with 13.5 million gallons per day.

The Barge team's successful expansion of the Mallard Fox Pump Station demonstrates their expertise in wastewater infrastructure planning and design. Their ability to assess the client's needs, evaluate alternative solutions, and deliver a cost-effective and sustainable project has contributed to the long-term success of the Mallard Fox Creek Industrial Park.

The Result

The Barge team's successful expansion of the Decatur Utilities Mallard Fox Lift Station demonstrates their expertise in wastewater infrastructure planning and design. Their ability to assess the client's needs, evaluate alternative solutions, and deliver a cost-effective and sustainable project has contributed to the long-term success of the Mallard Fox Creek Industrial Park.

Engineering
Water
No items found.
Decatur Utilities Mallard Fox Lift Station
Consult with an Expert
Thank you!
Your message has been submitted
Oops! Something went wrong while submitting the form.

We're collaborative by design. Let's team up.

Begin your project development journey today by contacting us.